Send Message
Sussman Machinery(Wuxi) Co.,Ltd
Email sales@suhangmachine.com TEL: 86-136-0619-3016
Home > products > Cable Tray Roll Forming Machine >
Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty
  • Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty
  • Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty
  • Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty

Place of Origin Wuxi, China
Brand Name Sussman
Certification CE, SGS, ISO
Model Number SS-SS
Product Details
Roller Stations:
About 19 Stations
Main Shaft Material:
45# Steel
Main Motor Power:
7.5Kw
Power Supply:
380V, 50Hz, 3Phase
Machine Size:
4.5mx0.8mx0.5m
Control System:
PLC With Touch Screen
High Light: 

metal forming machine

,

cable tray machine

Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
negotiable
Packaging Details
Standard package with film, plastic and steel wire.
Delivery Time
60 working days after deposit
Supply Ability
10 sets/month
Product Description

Solar Strut Roll Forming Machine

 

 

Technical Parameter

 

 

1. Suitable Plate Material: thickness 1.5-3mm, Galvanized steel or blank steel

2. Working Speed: 12-15 meters / min

3. Forming Steps: 19 stations

4. Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome

5. Material of Shaft: 45# Advanced Steel (Diameter: 76mm), thermal refining

6. Main Power with reducer: 22KW WH Chinese Famous

7. Cutting: Hydraulic Cutting Cr12mov

8. Material of Cutting Knife: Cr12Mov, Quench HRC58-62

9. The whole machine is controlled by industry computer-PLC.

10. PLC--Panasonic, Japan English and Chinese Language

11. Touch Screen--Panasonic Japan

12. Encoder--Omron, Japan

13.Electric parts--Schneider

14.Cutting holder: fly saw cutting

 

 

 Main Structure and Characters


 

   

Commodity & Description

  Quantity

   

5T manual uncoiler

  1 set

   

Leveing guiding

  1 set

 

 Servo feeding device

  1 set

   

Main roll forming machine

  1 set

 

 Punching Device

  1 set

 

 Cutting device

  1 set

 

 Finished products tabel

  1 set

 

 PLC control system

   1sets

 

 Out tables

  1 sets

   

Spare parts

  1 sets
 
 

 

Working Flow of Roll Forming Machine



Uncoiling-Feeding&Leveling-Punching--Roll forming-Cutting-Products collecting

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 0



A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)

B.Servo Feeding Applicator............................................To feed the material accurately

C.Hydraulic/Press Punching...........................................To punch as requirements

D.Roll Forming Unit.........................................................To roll form as requirements

E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)

F.Output Table................................................................Support the finished products

 

 

Standard profile of product

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 1

 

 Machine Photo

 

Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 2

 

 

Customer Visiting
 
Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 3
 
 
Loading picture
 
Material Thickness 1.5 - 3mm Solar Strut Roll Forming Machine 12 Months Warranty 4
 
 
After-sale Serive

    - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.

    - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.

    - Training time: 5 days.

    - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.

    -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
 

Contact Us at Any Time

86-136-0619-3016
NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Send your inquiry directly to us