Wall Angle Roll Forming Machine
Technical Parameter
Material of coil |
Material Thickness |
3mm galvanized sheet |
Forming system |
Rolling Speed |
About 15 m/min line speed |
|
Roller Stations |
About 9 stations total |
|
Roller Material |
45# Steel with quenching
|
|
Maim Motor Power |
5.5 kW |
|
Hydraulic cutting Power |
4 kW |
Cuttingsystem |
Material Of Cutting |
CR12 with quench treatment |
|
Hardness |
HRC58-62 |
|
Tolerance |
+-1.5mm |
Electrical control system |
Electric Source |
380V, 50HZ,3 phase Also can satisfy Customer’s require |
|
Control System |
PLC control system |
|
Weight |
About 2.5 tons |
|
Way Of Drive |
1 inch single chain |
|
Size of machine |
Length 4500* Width 500* Height 800mm |
Work Flow Chart
A. Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
B. Servo Feeding Applicator............................................To feed the material accurately
C. Hydraulic/Press Punching...........................................To punch as requirements
D. Roll Forming Unit.........................................................To roll form as requirements
E. Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F. Output Table................................................................Support the finished products
Decoiler—feeding with guide—Rollforming——Cutting—Products collecting
Machine Components
3T passive de-coiler |
1 set |
Main roll forming machine |
1 set |
PLC Control box |
1 unit |
Hydraulic station |
1 unit |
Out table |
2 units |
Following cutting |
1 unit |
Safety cover |
1 unit |
Machine Photo
Loading Pics
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Contact Us at Any Time