logo
Sussman Machinery(Wuxi) Co.,Ltd
Email sales@suhangmachine.com TEL: 86-136-0619-3016
Home > products > Floor Deck Roll Forming Machine >
0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge
  • 0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge
  • 0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge
  • 0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge
  • 0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge
  • 0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge

0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge

Place of Origin Wuxi, China
Brand Name SUSSMAN
Certification CE, ISO, SGS
Model Number SM-DE
Product Details
Material Thickness:
0.3-0.8mm Galvanized Steel
Working Speed:
0-12m/min
Roller Station:
About 18 Stations
Cutting Blade Material:
Cr 12 High Grade Steel
Cutting System:
Hydraulic Cutting
Control System:
PLC With Touch Screen
Highlight: 

Roof Trim Edge Roll Forming Machine

,

0.8mm Drip Edge Roll Forming Machine

,

12m/min Drip Edge Roll Forming Machine

Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
negotiate
Packaging Details
film+steel
Delivery Time
About 75 days
Payment Terms
L/C, T/T
Supply Ability
30 sets/month
Product Description

0.3-0.8mm Thickness Galvanized Steel Roof Trim Edge Making Machine Drip Edge Roll Forming Machine

* Raw materials it rolls: Pre-painted steel coils; Aluminum, Galvalum, Galvanized etc
* Material thickness: 0.28-0.8mm (PPGI,GI,GA,PPGA), 0.8-1.2mm(Aluminum)
* Capacity of De-coiler: 5 TONS
* Rollforming stations: 18 stations
* Roller materials: 45# steel with tempering treatment and chrome coating treatment
* Shaft diameter: 70mm
* Safety option: Safety Cover eqiupped
* Cutting: Hydraulic cutoff
* Material of Cutting blade: Cr12 steel
* Control unit: PLC control to ensure the machine to run both automatically and manually.

 

Item Name Description
1 Decoiler Capacity:5 tons
2 Material Steel Coil
3 Thickness 0.3-0.8mm
4 Transmission Chain/Gear/Gearbox
5 Speed 0-45m/min
6 Roller Steel with quenched treatment,chromed on the surface
7 Shaft steel with tempering treatment
8 Cutting type Hydraulic cutting
9 Cutting material Cr12 with quenched treatment Hardness58°-62°
10 Welding Automatic spot welding
11 Control system PLC
12 Electric brand Delta,Siemens,Schneider
13 Voltage

380V,50HZ,3PH(or as customers' request)

 

Machine List
S.N
Name
Quantity
1
3 ton passive decoiler
1 set
2
Main roll forming machine
1 set
3
Hydraulic Cutting
1 set
4
Control box
1 set
5
Output table
1 set

0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge 0

0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge 1

0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge 2

 

Profile Drawing

 

0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge 3

 

Application

 

0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge 4

0.3 - 0.8mm Drip Edge Roll Forming Machine Galvanized Steel Roof Trim Edge 5

 

Maintance and the service of the machine

 

Daily maintenance with meticulous care plays an important part in extension the equipments’ operation time and the quality of rolling plank. Therefore, please do the following things in your daily

1.The hydraulic tank must be filled with 32# or 46# hydraulic oil before using. The amount of oil is subject to the oil mark
2. Add and daub lube often to the outside parts. (Such as driving chain,Scissors, gears, rollers, )
3. Wipe the surface dust of roller often and particularly work outside. If you do not use it for long time ,you should daub
machine and lube in the roller surface and you need clean it when you use next time.
4. If the equipment does not use for long time, you should use plastics cloth or other articles to cover it and notice to avoid
rain and damp, especially electrical controlling box
5. Cutting device should add lube to the places where need lube to the request
6. Usually look into hydraulic station and the oil quantity of deceleration machine, you should add in time when oil quantity
shortage
7. Electrical components should be guaranteed to work in a dry environment, such as damp. Rain should continue to work after drying.

Contact Us at Any Time

86-136-0619-3016
NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Send your inquiry directly to us