1. Technical Parameter
Steel Thickness | 0.75-1.2mm |
forming speed | 0.-12m/min |
raw material width | 1000mm |
Roller stations | 30 stations |
Roller material | 45# steel |
shaft diameter | 90mm |
main motor power | 22Kw |
Hydraulic cutting power | 5.5Kw |
Hydraulic pressure | 12Mpa |
Power supply | 380V, 50Hz, 3Phase |
Cutting blade material | Cr12 |
2. Machine Components
5 Ton passive decoiler | 1 set |
Main roll forming machine | 1 set |
Control box | 1 unit |
Hydraulic station | 1unit |
Out table 500mm | 2 units |
3. Details of Each Composition
Cutting:
Control Box: Panasonic Brand
4. Profile
5. Machine Photo
6. Installation
The individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of:
- Installation by Suhang service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.
Delivery extent does not comprise of:
- Media supply (electrics, etc.)to the machine(control cabinet)
- Raw material,process material
- Raw material for test
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.
7. Commissioning of the Machine
The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
The commissioning comprises:
- Commissioning by Suhang service technicians
- Training at the machine
- The following services are rendered
- Run up of the machine components
- Testing of all functions of the machine components
- Start of a fully automatic molding process
- Execution of machine acceptance
Delivery extent does not comprise of:
- Raw materials, process materials and consumables
- Raw material for test
- Transport and lifting devices
The operators of the plant should be present during the commissioning in order to become familiar with the new machines.
Contact Us at Any Time