Place of Origin | Wuxi Jiangsu China |
Brand Name | Sussman |
Certification | CE |
Model Number | SM-PUSP |
Electrical Shearing 0.75kw Discontinus 6m Length PU Sandwich Panel Production Line 600 - 1250mm Feeding Width
The panel line include machinery part,electrical control system part and additional machine for panel
overall power equipment:80 kw
size of the line:overall length of the line is 45000mm,overall width of the line is 4500mm(max),overall height of the line is 2200mm
overall weight of the line:~30 t
PU Sandwich Panel Technical Parameter
Uncoiler
type of uncoiler:manual
material of coil:color coating coil
thickness of sheet:0.3~0.6mm
width of coil: 1000mm,1200mm
weight of coil:≤ 5 t
inside diameter of coil:480~520mm
apply guard film
type of apply guard film:automatic
into shearing
type of shearing:electrical shearing
driven power: 0.75 kw
edge forming machine for wall
design of profile:see drawing attached
type of forming:one layer forming
roller diameter:¢72mm
material of roller: 45 steel heat treatment
thickness of chromic plating of roller surface:0.05~0.06mm
speed of forming:0~6.0m/min synchronies with panel machine
type of synchronies:electrical synchronies
driven power: 3.0 kw
installation instruction:two parts
size of forming machine:8000×2200×2200mm
weight of forming machine:~8 t
PU High-pressure pre-expander
The main technical specification and instruction of the equipment
1. Equipment type: SM-300
2. Range of application: Hard PU foam products
3. Injection capacity: 1000-4500g/s
Range of mixing proportion adjustment: 1:3-3:1
Injection time: 0-99.9s
Injection program quantity: 99
Manual injection: 1
4. Pressure limit and the controlling system
Working pressure of the Polyester polyol and the WDP should be between 5-10Mpa. If the working pressure is over this range, the PU computer will be on automatic protection state.
5. A/B groups’ flow capacity controlling and the testing unit (hydraulic controlling)
According to the output capacity of the pump and the technological requirements of the groups’ mixing proportion, coordinating with the adjusting handwheel of the measuring pump to test and adjust the two components flow capacity parameter and the mixing proportion parameter to realize the testing and controlling of the groups’ flow capacity.
6. Hydraulic unit
Flow capacity of the pump (L/min): 5SCY14-1B
Nominal discharge capacity (ml/r): 5
Rotate speed (rpm): 1500
One 50KG oil tank, whose upper side supports the installing plate;
Install the driving motor, oil pump, hydraulic integrated package on the installing plate. And on the integrated package there are pressure increasing valve and unloading valve, ect.
One 2.5L high pressure energy accumulator to make sure the fast switch and vibration absorption of the mixing head.
Three Project description
1 The supplier should provide with the equipment and the technology service according to the contract;
2 Things that the buyer should do
1) Before installing the equipment, the buyer should prepare the place, water, electricity as well as the testing and the producing material.
2) Responsible for supplying the lift, carrying equipment, tools and operate, and there will be special workers to coordinate the installing and testing work.
3) Responsible for connecting the driving electric power to the main input power switch of the electric cabinet
Two Configuration List
No | Name | Manufacturing Location | Quantity |
1 | Frame | China | 1 set |
2 | Metering pump | China | 2 sets |
3 | Hydraulic | Taiwan | 1 set |
4 | Electric appliance | China DELIXI | 1 set |
5 | Electric appliance control system | China (Taiwan technology) | 1 set |
6 | Motor | China (patent product) | 6 sets |
7 | Temperature control system | China | 2 sets |
8 | High pressure mixing head | China | 1 piece |
9 | Pipes | China | 1 set |
10 | Cooling system | China | 1 set |
11 | Accessories along with the equipment | China | 1 set |
Advantage for PU Sandwich Panel
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
Working Flow of PU Sandwich Panel
Profiles of PU Sandwich Panel
Loading Pic
Installing
1) Before installing, the buyer should prepare the installing place, water, electricity(three phase,60KW), DOP 100KG, 46# hydraulic oil 50KG as well the testing and producing material.
2)The buyer should supply with the lift, carrying equipment, tools and operate, and there will be special workers to coordinate the installing and testing work.
Contact Us at Any Time