Product Details:
|
Material Thickness: | 1mm--4mm | Forming Stations: | 15 Stations |
---|---|---|---|
Power Supply: | 380V, 50Hz, 3Phase(or Customized) | Material: | Galvanized Color Sheet |
Dirve System: | Gearbox Dirving | Machine Weight: | About 8 Tons |
High Light: | corrugated roll forming machine,guard rail roll forming machine |
Guard railway roll forming machine
Guardrail Roll Technical Parameter
Guardrail Roll Main Components
|
Quantity |
3T hydraulic un-coiler |
1 set |
Feeding and leveling device |
1 set |
Main roll forming machine 15 stations drived by gear box
|
1 set |
Hydraulic station |
1 set |
Control system (including control box) |
1 set |
Out tables |
2 sets |
Punching Device |
2 sets |
Working Flow of Guardrail Roll
A. Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
B. Servo Feeding Applicator............................................To feed the material accurately
C. Hydraulic/Press Punching...........................................To punch as requirements
D. Roll Forming Unit.........................................................To roll form as requirements
E. Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F. Output Table................................................................Support the finished products
Standard Profile Drawing
Photo Gallery
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Contact Person: Spring Wu
Tel: +86-13606193016