Home
>
products
>
Guardrail Roll Forming Machine
>
Gear Box Transmission Steel Two Waves Guardrail Making Machine Punching Press Machine Automatic cutting
Technical Parameter
|
Item |
Specification |
|
Steel Sheet Thickness |
2-4mm (depend on requirement ) |
|
Hydraulic power |
7.5Kw |
|
Transmission way |
gear box |
|
Material of blad |
Cr12, quenching treatment |
|
Capacity of Decoiler |
5 Ton hydraulic decoiler |
|
Forming Speed |
5-20m/min(not including punching time) |
|
Roller Groups |
about 13 stations main roller |
|
Roller Material |
GCr15, quenching treatment |
|
Roller Diameter |
180mm |
|
Principal Axis |
45# high grade steel with quenching treatment |
|
Main Motor Power |
22 Kw |
Main Components
1. 5 ton hydraulic decoiler-------------------------------- 1Set
2. Leveling device------------------------------------------ 1Set
3. Punching machine-------------------------------------- 1Set
5. Main roll forming machine---------------------------- 1Set
6. Hydraulic station----------------------------------------- 1Set
7 Cutting device-------------------------------------------- 1Set
8 Finished products tabel--------------------------------- 2Set
9 PLC control system-------------------------------------- 1Set
7. Spare parts------------------------------------------------ 1Set
8. Gear box---------------------------------------------------- 1Set
Applications
Highway Guard Rail
Working Flow
Decoiler ---- Feeding --- Levelling---Punching--- Roll Forming ---- Cutting ---- Run out table
Profiles Of Rack Shelf
![]()
![]()
Advantage for Roll Forming Machine
1). Reasonable Price
2). High Quality
3). 12 Months Warranty
4). More Than 10 Years Experience
5). Durable
6). Reliable
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Machine Photo
![]()
Contact Us at Any Time