PLC Control system 8-12M/Min High Speed Guardrail Roll Forming Machine Glazed Steel Color Customized
Passive decoiler | |
Max. width of coil can be loaded | 500mm |
Mandrel Nominal Dia | 120mm |
Inner diameter | 470-520mm |
Max.out diameter | 1600mm |
Feeding&levelling applicator | |
Feeding roller diameter | 180mm |
Material of roller | 45# steel, HRC48-52 |
Leveling roller | upper is 3 rollers, down is 4 stations |
Diameter of leveling roller | 180mm |
Punching holds | |
Hydraulic unit | 2 units punching |
Mould material | Cr12 quenched 58-62 |
Hydraulic power | 7.5K.W |
Roll forming line | |
No. of work station | 14 |
Roller Diameter | 100 |
Thickness of coil | 3-4mm |
Max. Roll shafts Dia | 100mm |
Forming Speed | 5-20m/min |
Transducer | Panasonic |
Transmission | by gear box: 200*500 |
Hydraulic cutting | |
Max.thickness | 3.5mm |
Cutting material | Cr12,quenched 58-62 |
Hydraulic pressure | 30 Mpa |
Cutting system | Hydraulic die cutting |
Does one machine can only produce one style panel profile?
Not exactly.For wider and double layer making machine. It can produce more than 6 kinds of panels.
Do you have after sales support?
Yes, we are happy to give advice and we also have skilled technicians available across the world.We need your machines running in order to keep your business running.
What can you do if the machine broken?
Our machine's warranty period is 12months,if the broken parts can't repair,we can send the new parts replace the broken parts free,but you need pay the express cost yourself.if after warranty period,we can through negotiation to solve the problems,and we supply the technical support for the whole life of the equipment.
Why your price is higher than others?
As we persist on that each factory should put quality at the first place. We spend time and money on developing How to make machines much more automatic, accurate and high quality. We can make sure that our machine could use more than 20 years without any problem. We can provide 2 years free quality guarantee.
How long the machine could be made?
Normally speaking, welded pipe making machine could be made without 45 working days. If you need machines in a hurry, we can make it for you less than a month.
Contact Us at Any Time