|
Place of Origin | China |
Brand Name | SUSSMAN |
Certification | CE, SGS, ISO9001 |
Model Number | SS-VY |
16 Stations Vineyard Post Machine Galvanized Steel Sheet G550 Roll Forming Equipment
Vineyard is widely used for grape stake at Chile, Peru, Spain, France, it is light, easy to move and not easy be broken compare to the normal wooden stake.
d
Technical Parameter
1.1 | Rolling speed | 2-3m/min |
1.2 | Rolling thickness | 1.2-2mm |
1.3 | Raw material | Galvanized steel sheet G550 |
1.6 | dimension | 6500×600×1200(mm) |
1.7 | Effective width | 50mm |
1.8 | Roller stations |
About 16 stations
|
1.9 | Roller material | Gcr15, coated with chrome, Quenching |
1.10 | Shaft diameter | Φ60mm ,material is 45# forge steel |
1.11 | Transmission | By Chain |
1.12 | Material of chain | 45# forged steel with frequency quenching, 12A |
1.13 | Main Motor | 7.5kw |
1.14 | Material of cutting | Cr12Mov with quench HRC58-62° |
1.15 | Cutting Tolerance | 6m+-1.0mm |
1.16 | Voltage | 220v, 60hz, 3phase |
Main Roll forming machine technique data
1. Suitable Plate Material: thickness 1.2-1.5mm, Galvanized steel or blank steel
2. Working Speed: about 15-18meters / min
3. Forming machine: about 16 stations
4. Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome
5. Material of Shaft: 45# Advanced Steel (Diameter: 75mm), thermal refining
.6. Drive system: Gear box driven
7. Main Power with reducer: 11KW WH Chinese Famous
8. Cutting: Hydraulic Cutting Cr12mov
9. Material of Cutting Knife: Cr12Mov, Quench HRC58-62
10. Hydraulic Station Power: 4KW Wuxi Wanshen Famous Chinese Brand
11. The whole machine is controlled by industry computer-PLC.
Machine operation: Manual and full automatic mode at same time with limit switches, and panel support device
Working Flow of Roll Forming Machine
Decoiler----feedingwithguide---Punching----Rollforming----Cutting----Products collecting
Profile of product
Loading pictures
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Contact Us at Any Time