|
Place of Origin | Wuxi, China |
Brand Name | Sussman |
Certification | CE, SGS, ISO |
Model Number | RF-ST |
High Production Capacity Coil Width 500-1600mm Slitting Line Machine Steel Slitting Machines
1. Where are We?
We sell products in the Middle East, Turkey, East Europe, Russia, South and East Asia and South America. Our factories are in Wuxi, which is just 100 km from Shanghai, just 45 min by the fast train. We have rich technology in design and manufacture for different requirements.
Our goal is to supply high quality products. We also try to guarantee timely delivery, all around services at reasonable cost. We have already established favorable relationships with many clients around the world. Working to extend our presence internationally, we are looking forward to cooperating with your company for mutual benefit. Please feel free to contact us.
2. Technical Parameter
3. Composed Device
4. Machine Components
1. Hydraulic entry coil car
2. The paper rewinding machine
3. Hydraulic cantilever de-coiler
4. Press and pinch device
5. Hydraulic head cutting machine
6. Loop 1
7. Side Guide Device
8. Slitting Machine
9. Scrap winder
10. Loop 2
11. Pre-dividing tension evice
12. Hydraulic recoiler
13.Hydraulic Exit Coil Car
14. Hydraulic System
15. Electric Control System
5. Assembly and Commissioning:
One engineer will be dispatched to visit the Buyer’s workshop for installing,commissioning and training of the Buyer’s Operation personnel. The total cost involved will be determined within that period of time. If the service duration is within fifteen(15) working days then USD100/day for each person, and that the costs for the two-way air tickets, feeding and accommodation in the Buyer’s own country(or country where the installation is been done) should be paid by the Buyer. If the installation of the plant exceeds 15 working days, then additional payment of USD100/day for each person should be paid for all our Service Technicians doing the installation at the Buyer’s installation site. The Buyer has to make sure that the pre-installation is being done in time and properly in order to avoid wasting time and creating other problems. During the installation and testing running of all the equipments, the Buyer should provide auxiliary personnel to help speed up the work at the Buyer’s installation site.
Contact Us at Any Time