Steel coil cutting to length line machine
Technical Parameter
NO. |
Name |
Unit |
Parameters |
1 | cutting to length line | ||
2 | Materials | Aluminium | |
3 | Thickness | mm | 0. 12-3mm |
4 | Width | mm | 300--1250 |
5 | Coil I.D. | mm | 508 |
6 | Coil O.D. | mm | ≤1250 |
7 | Weight | T | 6 |
8 | Slitting blade shaft | mm | Φ120 |
9 | Blade specification | mm | Φ220×Φ120×10 |
10 | Material of blade | 6CrW2Si | |
11 | Line speed | m/min | ≤30 |
12 | Power of decoiler | KW | 11 |
13 | Power of slitting machine | KW | 15 |
14 | Power of recoiler | KW | 30 |
15 | Leveling roller diameter | 55mm | |
16 | Width tolerance | ≤±0.05 mm | |
17 | The direction of whole line | from right to left, the operate table faces the machines | |
18 | Power | 380V/3Ph/50Hz( Customized) | |
19 | Operation people | 1 technician and 1 general worker | |
20 | Color | green ( Customized) |
Main Components
No. | Name | Quantity |
1 | Manual expand de-coiler | 1 set |
2 | Cutting main machine | 1 set |
3 | Scrap winder | 1 set |
4 | Tension stand | 1 set |
5 | Mechanical recoiler | 1set |
6 | Straightener | 1 set |
7 | Cutter | 1 set |
8 | Receivable tacle | 1 set |
9 | Electrical control system |
1 set |
Advantage of machine
1. Reasonable Price
2. 12 Months Warranty
3. Durable
4. Reliable
During the warranty period, maintain and change the spare parts for the customers for free (except for the instrument damage caused by human factors or natural disasters. ) And provide technical support for life-long.
We can design and manufacture the machine according to clients' request! Our machines have passed CE, Guaranteed quality. Please send us the enquiry with Profile Drawing.
Photo Gallery
Loading pictures
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 7 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 4 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Contact Us at Any Time