Send Message
Sussman Machinery(Wuxi) Co.,Ltd
Email sales@suhangmachine.com TEL: 86-136-0619-3016
Home > products > Cable Tray Roll Forming Machine >
GCr15 Roller Cable Tray Machine 380V 50Hz 3 Phase with Hydraulic Cutting Cr12mov
  • GCr15 Roller Cable Tray Machine 380V 50Hz 3 Phase with Hydraulic Cutting Cr12mov
  • GCr15 Roller Cable Tray Machine 380V 50Hz 3 Phase with Hydraulic Cutting Cr12mov

GCr15 Roller Cable Tray Machine 380V 50Hz 3 Phase with Hydraulic Cutting Cr12mov

Place of Origin Wuxi, China
Brand Name Sussman
Certification CE, SGS, ISO
Model Number RF-ST
Product Details
Roller Material:
GCr15
Drive Way:
Chain
Control System:n:
PLC With Touch Scree
Power Supply:
380V, 50Hz, 3 Phase
Warranty:
12 Months
Forming Speed:
5-8m/min
High Light: 

cable tray machine

,

plate rolling machine

Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
negotiable
Packaging Details
Standard package with film, plastic and steel wire.
Delivery Time
60 days after deposit
Supply Ability
10 sets/month
Product Description

Cable tray roll forming machine​ 

 

 

 Main Specifications 

  • Cable tray width: 30-500mm
  • Working Speed: 5--8m / min 
  • Forming stations: according to different profiles, about 20 roll station
  • Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome
  • Material of Shaft: 45# Advanced Steel (Diameter: *90mm), thermal refining
  • Main Power with reducer: 22 KW 
  • Cutting: Hydraulic Cutting Cr12mov
  • Material of Cutting Knife: Cr12Mov, Quench HRC58-62
  • Hydraulic Station Power: 7.5KW Wuxi Wanshen Famous Chinese Brand
  • The whole machine is controlled by industry computer-PLC. 
  • PLC--Panasonic, Japan
  • Touch Screen—Panasonic, Japan
  • Drive way: Chain drive, with 1.5 inch 20A Chain

 

 

Main Components

 
Item Name: Cable mounting system Roll Forming Line
Material: GI
Line Speed 5--8m/min
Material Coil width Per the design of product
Power 380V, 50Hz, 3 Phase or according the client's request
Gram Weight: Around 20 tons
Delivery time: about 65--70 working days
MOQ: 1 Set
Delivery FCL
Warranty 1 year

 

 

 

 

  Cable Tray Profile Drawings  

 

 

GCr15 Roller Cable Tray Machine 380V 50Hz 3 Phase with Hydraulic Cutting Cr12mov 0

 

 

 

  Working Flow  

 

De-coiler-→Level device -→Main roll forming machine-→Hydraulic cutting-→ Run out table

 

GCr15 Roller Cable Tray Machine 380V 50Hz 3 Phase with Hydraulic Cutting Cr12mov 1

 

 

 

Transportation

 

All goods will be shipped to your country, containers number will be decided with how many machines would you choose

 

Installation of the machine

 

The individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of:

- Installation by Sussman service technicians.

- The following services are included:

- Installation of the machine components.

- Adjustment of the machine components.

- Connection of all motors to the control cabinet.

- Installation of the required safety devices.

Delivery extent does not comprise of:

- Media supply (electrics, compressed air, etc.)to the machine(control cabinet)

- Raw material,process material and fuels

- Raw material for test blocks

- Transport and lifting devices

- Auxiliary staff.

The operators of the plant should be present during the installation in order to become familiar with the new machines.

 

Commissioning of the machine

 

The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.

The commissioning comprises:

- Commissioning by Sussman service technicians

- Training at the machine

- The following services are rendered

- Run up of the machine components

- Testing of all functions of the machine components

- Start of a fully automatic molding process

- Execution of machine acceptance

Delivery extent does not comprise of:

- Raw materials, process materials and consumables

- Raw material for test blocks

- Transport and lifting devices

The operators of the plant should be present during the commissioning in order to become familiar with the new machines.

 

Our After-Sales Service Commitments

 

Sussman hereby solemnly promises: We implement the “three guarantees” service policy for any equipment sold by Sussman, provide free of charge installation guidelines, commissioning and maintenance of the equipment, training of the Buyer’s relevant Operators; and provide technical requirements for the installation and operation of the equipment, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts

The detailed measures are as follows:

1.Guidelines for installation and commissioning of equipment:

Based on the actual situation, to assist and guide the Buyer and Buyer’s technical personnel in the overall installation location, the installation of equipment, and provide Buyer with answers to their questions and related issues;

 

2.Provide training for operation and maintenance personnel:

Based on the Buyer’s request, Sussman will provide free of charge training of the operation and maintenance personnel;

a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;

b) When Sussman is doing the installation and test running of the equipment for the Buyer, the Buyer can send their personnel to participate.

 

3.If failure occurs in any of the machines during the “three guarantees” period(one year), then, upon the Buyer’s request, Sussman will eliminate the failure;

 

4. Sussman will inform all its Buyers about any upgrades and significant product improvements. Sussman will provide equipment modifications based on their costs. Sussman will provide Buyers with high-quality after-sales services in a careful and responsible attitude, provide very strong guarantee for the Buyer’s normal production.

We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email

 

Quality Control

1.We strictly control the quality of raw materials and we can offer inspection certificate of our raw materials for you.
2. We do manufacturing strictly according to the technological processes. Besides, we carry out sampling inspection for our products.
3. All of our workers have received relevant quality management training so that the quality of products can be ensured.
Our goal is to offer the best solution for our customers, supply high quality machine and good service with reasonable price. We sincerely hope to cooperate with worldwide customers for mutual success.

 

 

FAQ

1) Q: Are you manufacturer or trading company?
A: We are manufacturer and trading company .

2) Q: Do you provide installing and training overseas?
A: Overseas machine install and worker training services are optional.

3) Q: How is your after sales support?
A: We provide technical support on line as well as overseas services by skillful technicians.

 

4) Q: How does your factory do regarding quality control?
A: There is no tolerance regarding quality control. Quality control complies with ISO9001. Every machine has to past testing running before it's packed for shipment.

5) How can I trust you that machines pasted testing running before shipping?
A: 1) We record the testing video for your reference. Or,
2) We welcome your visit us and test machine by yourself in our factory.

6) Q: Do you sell only standard machines?
A: No. Most machines are made to order.

 

Contact Us at Any Time

86-136-0619-3016
NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Send your inquiry directly to us