Send Message
Sussman Machinery(Wuxi) Co.,Ltd
Email sales@suhangmachine.com TEL: 86-136-0619-3016
Home > products > Rack Roll Forming Machine >
Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller
  • Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller
  • Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller
  • Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller
  • Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller

Place of Origin China
Brand Name SUSSMAN
Certification CE.SGS.ISO
Model Number SS-RS
Product Details
Material Thickness:
1.2-2mm
Forming Speed:
12-15m/min
Forming Stations:
18 Stations
Material:
Galvanized Steel
Control System:
PLC With Touch Screen
Main Power With Reducer:
11KW
Hydraulic Station Power:
5.5KW
High Light: 

racking roll forming machine

,

steel roll forming machine

Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
negotiable
Packaging Details
Standard package with film, plastic and steel wire. (or customized)
Delivery Time
Shipped in 90 working days after payment
Payment Terms
L/C, T/T
Supply Ability
10 sets per month
Product Description

Racking shelf roll forming machine


 Technical Parameter
1. Suitable Plate Material: thickness 1.2-2.0mm, Galvanized steel S235JR
2. Working Speed: 12-15 meters / min
3. Forming machine: 18 stations 
4. Material of Roller: Gcr15, Quench HRC58-62 Plated Chrome
5. Material of Shaft: 45# Advanced Steel (Diameter: 76mm), thermal refining
6. Driven system: Chain Driven 1.5 inches 20A double chain with longer shafts
7. Main Power with reducer: 11KW WH Chinese Famous
8. Cutting: Hydraulic Cutting Cr12mov
9. Material of Cutting Knife: Cr12Mov, Quench HRC58-62
10. Hydraulic Station Power: 5.5KW  
11. The whole machine is controlled by industry computer-PLC.
12 PLC--Panasonic, Japan English and Chinese Language
13. Touch Screen--Panasonic Japan
14. Encoder--Omron, Japan
15. Electric parts--Schneider
16. Outline of main about 7500mm*800mmm*800mm
17. Weight : about 8 tons

 
 Main Components

 

Serial No.

   

       Commodity & Description

 

Quantity

 

1

5T manual uncoiler

1 set

 

2

Leveing  guiding

1 set

 

3

Servo feeding device 

1 set

 

4

Punching machine 

1 set

 

5

Main roll forming machine 

1 set

 

6

Hydraulic station

1 set

 

7

Cutting device

1 set

 

8

Finished products tabel

1 set

 

9

PLC control system

2 sets

 

10

Out tables

1 set

 

11

Spare parts 1 set
 

 


Working Flow of Roll Forming Machine
 

A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
 

B.Servo Feeding Applicator............................................To feed the material accurately
 

C.Hydraulic/Press Punching...........................................To punch as requirements
 

D.Roll Forming Unit.........................................................To roll form as requirements
 

E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
 

F.Output Table................................................................Support the finished products


Uncoiling—Feeding&Leveling-Punching--Roll forming—Cutting—Products collecting
 
 
Crash-barrier-roll-forming-machine.jpg
 

Advantage of machine

 

1. Reasonable Price

 

2. High Quality

 

3. 12 Months Warranty

 

4. More Than 10 Years Experience

 

5. Durable

 

6. Reliable

 

 

 

 Profile of product 
 
profile1.png
 

 

 

 Photo Gallery


Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller 2

 

 

Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller 3

 

 


Hydraulic Station Power 5.5KW Galvanized Steel Roll Forming Machine Gcr15 Roller 4

 

 

 

After-sale Serive

 


       - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
       - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
       - Training time: 5 days.
       - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
        -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

 

 

Contact Us at Any Time

86-136-0619-3016
NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Send your inquiry directly to us