1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO
Technical parameter
Items | Specifications | Remarks | |
Material of coil | Material Thickness | 1.0-2.0mm galvanized | |
Un Coiler | 3 tons manual | ||
Forming system | Rolling Speed | 10-15 m/min | |
Roller Stations | 10 stations | ||
Roller Material |
Gcr15 Steel with quenching 60mm shaft
|
||
Maim Motor Power | 5.5 kw | ||
Hydraulic cutting Power | 4 kw | ||
Cutting system |
Material Of Cutting | CR12 with quench treatment | |
Hardness | HRC58-62 | ||
Tolerance | +-1.5mm | ||
Electrical control system | Electric Source |
380V, 50HZ,3 phase Also can satisfy Customer’s require |
|
Control System | PLC (Panasonic) as list in the note | ||
Weight | About 3 tons |
Technological process
Uncoiler—Feeding—Leveling—Punching&Cutting—Roll forming—Output table
Installation of the machine
The Individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of
- Installation by Sussman service technicians.
- The following services are included.
-Installation of the machine components
-Adjustment of the machine components
- Connection of all motors to the control cabinet
-Installation of the required safety devices.
Commercial Conditions
1. Port of Loading: FOB Shanghai
2. Delivery time: 60 days after technical clearance and down payment
3. Payment: 30% TT in advance, balance before delivery
4. Assembly and comissioning: Two engineers will visit buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day. The customer should ensure the pre-installation being carried out appropriately.
5. Warranty: 12 months warranty starting from the date of the successful installation and commissioning of the equipments.
Related Products
Contact Us at Any Time