Send Message
Sussman Machinery(Wuxi) Co.,Ltd
Email sales@suhangmachine.com TEL: 86-136-0619-3016
Home > products > Cable Tray Roll Forming Machine >
1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO
  • 1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO
  • 1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO
  • 1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Place of Origin Jiangsu,China
Brand Name Sussman
Certification CE,SGS,ISO
Model Number SM-CT
Product Details
Thickness:
1.0-2.0mm Galvanized Steel
Main Power:
5.5kw
Rolling Speed:
10-15m/min
Electric Source:
380V, 50HZ,3 Phase
Roller Stations:
10 Stations
Cutting:
Hydraulic Cutting
Hydraulic Station:
4KW
Control System:
Industry Computer
High Light: 

metal forming machine

,

plate rolling machine

Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
negotiable
Packaging Details
Film and steel wire
Delivery Time
60 days after deposit
Payment Terms
L/C, T/T
Supply Ability
5 sets per month
Product Description

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

 

 

Technical parameter

 

  Items Specifications Remarks
Material of coil Material Thickness 1.0-2.0mm galvanized  
Un Coiler 3 tons manual  
Forming system Rolling Speed 10-15 m/min  
Roller Stations 10 stations  
Roller Material

Gcr15 Steel with quenching 60mm shaft

 

 
Maim Motor Power 5.5 kw  
Hydraulic cutting Power 4 kw  

Cutting

system

Material Of Cutting CR12 with quench treatment  
Hardness HRC58-62  
Tolerance +-1.5mm  
Electrical control system Electric Source

380V, 50HZ,3 phase

Also can satisfy Customer’s require

 
Control System PLC (Panasonic) as list in the note  
  Weight About 3 tons  

 

 

Technological process


Uncoiler—Feeding—Leveling—Punching&Cutting—Roll forming—Output table

 

 

Installation of the machine

 

The Individual components of the machine are installed according to the layout and prepared for the commissioning.

 

The installation comprises of

- Installation by Sussman service technicians.

- The following services are included.

-Installation of the machine components

-Adjustment of the machine components

- Connection of all motors to the control cabinet

-Installation of the required safety devices.

 

 

Commercial Conditions

 

1. Port of Loading: FOB Shanghai

2. Delivery time: 60 days after technical clearance and down payment

3. Payment: 30% TT in advance, balance before delivery

4. Assembly and comissioning: Two engineers will visit buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day. The customer should ensure the pre-installation being carried out appropriately.

5. Warranty: 12 months warranty starting from the date of the successful installation and commissioning of the equipments.

 

Related Products

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO 01.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO 1

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO 2

Contact Us at Any Time

86-136-0619-3016
NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Send your inquiry directly to us