Chain Transmission SH-77 Foamed Roller Shutter Forming Machine Flying Saw Cutting
1. Technical Parameter
Material thickness: 0.3- 0.4mm. coil width: 140mm
Material yield strength: ≤G200Mpa
Forming stands: about 38 stands
Roller material GCr15: model steel, HRC50-54
Axial diameter: Φ40mm
Main axial material: No 45 steel HRB260-280
Driving part is gear box transmission
Frequency conversion decelerating:Delta
PLC control: fix length control ±1mm (Delta)
Main components: CHINT, DELIXI
The precision of roller: less than ±0.5mm
Main roll forming machine motor: 380V, 50HZ, 11kw (or according to your requirements)
Machine basement material: H beam
Working speed: 8-15m/min
2. Working Flow
Decoiler—feeding device—main forming—PU injection---straighten device—punching—Cutting---run out table
3. Machine Components
1 | Decoiler | 1 set |
2 | Guide Feeding device | 1 set |
3 | Main Forming machine | 1 set |
4 | Foaming machine (just foamed one owned) | 1 set |
5 | Straighten device | 1 set |
6 | Punching device | 1 set |
7 | Flying saw cutting machine | 1 set |
8 | Finished products table | 1 set |
9 | PLC control system | 1 set |
10 | Spare Parts And Tools | 1 set |
4. Profile Drawing
Packaging & Delivery
Packaging Details: Main machine is nude in the container, the computer control box is packed with wooden packaging.
Delivery Detail: 60 workdays after we receive the 30% advance payment
Advantage for Roll Forming Machine
1.Advanced machinery, well trained workers.
2.More than 12 years experience in roll forming machine Ad industry.
3.Unique designed, good quality, competitive price.
4.Full range of roll forming machine solution.
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Our customer' visiting
Contact Us at Any Time