16 Roller Station Automatically Roll Forming Machinery Height and Width Adjustable
1. Technical Parameter
Materials to form door frame: According to the customers’ requirement
Work speed: 3-15m/min
Forming steps: About 16 steps
Material of rollers: GCr15 steel, precision-machined, high frequency quenching HRC58-62,
Material of main shaft : 45# high quality steel
Chains’ material: 45# steel, high frequency quenching, circular pitch: 38.1;
Main motor power: 7.5KW
Cutting : Hydraulic cutting, 4kw;
Electronic control: Plc control
Dimension of main machine: About 8000mmX800mmX800mm
2. Work Flow
De*coiler—→level device—→main forming machine—fly saw cutting—→ run out table
3. Machine Composition
Name |
Quantity (set) |
De-coiler |
1 |
Level device |
1 |
Main forming machine |
1 |
Fly saw cutting |
1 |
PLC Control panel |
1 |
Run out table |
1 |
4. Profile
5. Machine Photo
6. Loading Pics
7. Company Introduction
Sussman Machinery is a comprehensive enterprise integrating production, sales and services. We are mainly engaged in providing machineries and equipment. Owing to a professional teamwork, we are experienced in manufacturing, import and export, customers' design, installation and test, technical solution and after-sale services. We have shipped out our machines to more than 50 countries, and keep good business relationships with a large amount of worthy customers, contributing to our great business records and reputation.
8.Sales Terms
Delivery Terms:FOB Shanghai
Delivery Time:60 days after technical issues have been clarified, and after receiving payment of deposit (advanced payment)
Payment Terms:1. First payment (Deposit): 40 % by T/T
2. Second payment: 60% by T/T, after the successful inspection of the equipments by the Buyer or the Buyer’s representative at the Seller’s factory, but before the Seller delivers the equipments to Shanghai Port
Assembly and commissioning:
Warranty:
One engineer will visit Buyer’s workshop for install, commission and training for 7 days, the salary of our engineer cost USD100 per day, The customer should ensure the pre-installation being carried out appropriately. The buyer should pay round air tickets, the local board and lodging and the transportation cost for our engineer.
12 months warranty, Starting from the date of the successful installation and commissioning of the equipments.
Contact Us at Any Time