Product Details:
|
Name: | Rolling Shutter Door Slat Forming Machine | Material: | Aluminum Coil Plate And Colorful Galvanize Steel |
---|---|---|---|
Material Thickness: | 0.5-1.0mm | Forming Stations: | 13 Stations |
Roller Material: | GCr15 | Dirve Systemi: | 1 Inc Chain Drive |
Power Supply: | 380V, 50Hz, 3Phase | Forming Speed: | 8-15m/min Exclude Cutting |
Machine Size: | 3.5M X 0.5M X 0.8M | Machine Weight: | About 3.5 Tons |
High Light: | sheet metal roll former,rolling form machine |
Automatic Shutter Door Roll Forming Machine 3 Phase GCr15 Roller
Technical Parameter
Item NO |
Description |
Offered specification |
1 |
Product Line speed |
8-15m/min(not include cutting ) |
2 |
Suitable material thickness |
0.5-1.0mm |
3 |
Raw material |
Galvanized coils yield strength≤G250MPa |
4 |
Material width |
188mm Effective width 118mm |
5 |
Decoiler |
3 Ton passive decoiler |
6 |
Levelling device |
7 roller levelling including 3 top rollers and 4 bottom rollers |
7 |
Roller stations |
13 stations
|
8 |
Roller material |
Bearing steel, quenching treatment |
9 |
Shaft diameter |
Φ60mm ,material is 45# forge steel |
10 |
Transmission |
By chain one inch 20A single chain |
11 |
Material of chain |
45# forged steel with frequency quenching, 12A |
12 |
Cutting system |
Hydraulic cutting blade cr12mov with quench HRC58-62° |
13 |
Main motor power |
5.5kw |
14 |
Motor power of hydraulic station |
4kw |
15 |
Hydraulic station pressure |
12Mpa |
16 |
Tolerance |
6m+-1.5mm |
17 |
Machine Frame |
H Beam Steel |
Shutter Door Roll Forming line Main Components
|
Working Flow
Uncoiler—feeding with guide—Rollforming—Cutting—Products collecting
Standard Profile and Drawing
Payment Term
* Payment Term: 30 T/T in advance, 70% T/T before delivery
* Delivery Time: Within 60 Days after receipt of the down payment
* Warranty: 1 year and life-long maintainance
*Installation and debugging: We will send professional engineer to make installation and debugging, Buyer pay our engineer each one 100 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 7 days
Contact Person: Amber Chen
Tel: +8618112481091