PU Shutter Door Roll Forming Machine
Technical Data
1. Steel Sheet Thickness: 0.3-1.2mm (depend on requirement )
2. Cutting: fly saw cutting
3. Transmission way: chain
4. Material of blad: Cr12, quenching treatment
5. Capacity of Decoiler: 3 ton hydraulic decoiler
6. Forming Speed: 8-15m/min
7. Roller Groups: 38 stations
8. Roller Material: GCr15 grade steel, quenching treatment
9. Material: color-coated galvanized steel
10. Principal Axis: 45# high grade steel with quenching treatment
11. Main Motor Power: 11 Kw
Production Line Machine List
Serial No. |
Commodity & Description |
Quantity |
1 |
3T manual uncoiler |
1 set |
2 |
feeding guiding |
1 set |
3 |
Main roll forming machine |
1 set |
4 |
Output table |
1 set |
5 |
Main drive gear box |
1 set |
6 |
Fly saw cutting |
1 set |
7 |
Controlling system (including cabinet) |
1 set |
8 |
Water cooling system |
1 set |
9 |
Cassette |
2 sets |
Advantage of machine
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable
Standard Profile :
Working Flow
A.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
B.Servo Feeding Applicator............................................To feed the material accurately
C.Hydraulic/Press Punching...........................................To punch as requirements
D.Roll Forming Unit.........................................................To roll form as requirements
E.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F.Output Table................................................................Support the finished products
Uncoiling – feed Guiding–Roll forming ––fly saw cutting – Run-out table
Photo Gallery
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Loading pictures
Contact Us at Any Time